Excavator on an urban infrastructure site with a concrete overpass and distant city skyline
STRATA / APPLICATIONS

Every ground.
A different demand.

The material. The space. The work ahead. Find the machine conversation that starts with your site.

Explore the applications
GROUND / MACHINE / POSSIBILITY03 APPLICATION STUDIES
THE APPLICATION APPROACH

Start with
the ground.

A machine is one part of the picture. Material, access and working rhythm help define the right starting point.

01 Understand the material02 Define the working space03 Build the machine brief
01 / QUARRY / CONCEPT STUDY

Quarry & earthworks

Open faces. Demanding materials. Repeated loading cycles. Begin with the ground conditions, material characteristics and the equipment that works alongside the excavator.

Quarry & earthworks — concept excavation application
FIELD NOTES / 01CONCEPT APPLICATION

What shapes
the specification.

  1. Material & duty cycle

    Describe fragmentation, abrasiveness and the main digging or loading task.

  2. Working geometry

    Review reach, loading height and the space available around the machine.

  3. Tooling & support

    Discuss bucket geometry, wear parts and maintenance access.

Discuss this application
A STARTING POINT

Build your
shortlist.

Review the exact configuration against your site requirements.

02 / URBAN / CONCEPT STUDY

Urban construction

Between structures, services and site boundaries, space shapes the brief. Define access, trench requirements and the movement of people and equipment before building a shortlist.

Urban construction — concept excavation application
FIELD NOTES / 02CONCEPT APPLICATION

What shapes
the specification.

  1. Access & footprint

    Record entry widths, turning space and any restrictions around the work area.

  2. Trench & foundation work

    Specify required depth, reach and the material being excavated.

  3. Attachments & logistics

    Match the tool to the task and discuss transport between sites.

Discuss this application
A STARTING POINT

Build your
shortlist.

Review the exact configuration against your site requirements.

03 / INFRASTRUCTURE / CONCEPT STUDY

Coastal infrastructure

Long work fronts and changing ground conditions require a clear project brief. Describe embankment work, material handling and access along the infrastructure corridor.

Coastal infrastructure — concept excavation application
FIELD NOTES / 03CONCEPT APPLICATION

What shapes
the specification.

  1. Ground & access

    Describe the working platform, site access and the planned movement of equipment.

  2. Reach & handling

    Review working geometry and material requirements with the proposed configuration.

  3. Environment & ownership

    Include exposure conditions, maintenance planning and parts requirements.

Discuss this application
A STARTING POINT

Build your
shortlist.

Review the exact configuration against your site requirements.

FROM SITE TO SPECIFICATION

A useful brief.
A clearer conversation.

Bring these three details to your first enquiry.

  1. 01

    The work

    Main task, material, typical working cycle and expected quantities.

  2. 02

    The site

    Access width, working reach, ground conditions and transport constraints.

  3. 03

    The setup

    Attachments, destination, delivery period and parts or support requirements.

Illustrative concept applications. Model links are starting points for discussion; confirm suitability for the actual site and configuration.

Read the buying guide
YOUR GROUND. YOUR NEXT MOVE.

Tell us about
the work ahead.

Start with the application.
Shape the machine brief around it.

Share your project